Skip to content

The route in outline

A typical cell leaves the supplier's workshop after factory acceptance, is crated and moved to Laem Chabang, travels by ocean to a West Coast port such as Los Angeles/Long Beach, Oakland or Seattle-Tacoma, clears US customs and continues by truck or rail to the plant. Air freight is sometimes used for urgent or smaller items.

Packing and crating

Agree export packing in the contract: seaworthy crates, robot arms fixed in transport position, moisture protection, shock and tilt indicators and marked lifting points. Wooden packaging must meet ISPM 15. Photograph each crate before sealing.

Documents you will need

  • Commercial invoice and packing list
  • Bill of lading
  • Origin documentation if you claim a trade-agreement rate
  • Importer Security Filing (ISF 10+2), filed no later than 24 hours before loading on the vessel
  • US customs entry and a customs bond
  • Technical description to support classification

US duties and fees

Industrial robots not elsewhere specified fall under HTS 8479.50.00, which carries a 2.5% general US duty. Thai-origin robots under this heading pay the general rate, unless another measure applies. Unlike Chinese-origin robots, they are not on the Section 301 lists.

Formal entries also pay the Merchandise Processing Fee of 0.3464% of value (minimum $34.58, maximum $670.86 for fiscal year 2027), and ocean shipments pay the 0.125% Harbor Maintenance Fee.

US trade policy is moving. In February 2026 the Supreme Court ruled that IEEPA does not authorise tariffs. A presidential proclamation of 28 October 2026 under Section 232 found that imports of robotics and industrial machinery threaten national security but imposed no new duties yet; it directed negotiations, with an update due within 180 days. Steel, aluminum and copper Section 232 duties can still apply to some machinery content. Confirm the rate with your customs broker on the date of entry.

What drives the timeline

We do not quote a single transit time: it depends on the carrier, the port pair, transshipment and the season, so ask your forwarder for current schedules. Also allow for booking, export clearance, ISF and entry filings, possible customs examination, inland transport, rigging and installation. Plan backwards from your production date.

Insurance and risk transfer

The Incoterms rule decides who insures the cargo and when risk passes. Under FCA or FOB the buyer usually takes the main transport risk; under CIF or CIP the seller arranges insurance, and Incoterms 2020 requires higher cover for CIP. For high-value equipment, consider your own all-risk policy.

Ready to start? Share your brief

Tell us what you need to automate and where it needs to go.

Talk to us